Views: 0 Author: Site Editor Publish Time: 2022-05-25 Origin: Site
This project installation was arranged from May 15th-24th,2022.
Injection molding machines and molds, syringe barrel printing machines, syringe assembly machines, soft blister packing machine,and ETO sterilization machine, all of them will be well installed and tested on-site. The machine operators’training will be arranged during the same period.
On-site installation usually to be handled by our domestic engineering team.
The quarantine control policy is kind of strict,therefore it will be more convenient and cost-effective to arrange the engineering team from local or nearby countries.
We have developed our engineering team in Turkey, Egypt,and India based on our over 16 years project experience overseas.
The 100000 class workshop construction was built by customer’s construction team and we have also provide some suggestion on the workshop layout.